Technical Center

Specifications, engineering notes, and compliance guidance.

Use this resource area to organize the questions that matter before requesting project-specific documentation.

Selection notes

Application, power range, and operational-context inputs for a first-stage review.

Request guidance

Compliance context

Standards and regional documentation questions to clarify with responsible teams.

Discuss requirements

Project brief

Bring application, region, and requested document type into one conversation.

Start a brief

Selection note: turbine selection depends on the measured wind regime, turbulence, site access, grid interconnection and maintenance route. Rated power alone is not a yield forecast; confirm the applicable performance assumptions and local permitting requirements for the specific site.

For a project review, document nominal power in kW or MW, the measured wind regime, turbine control response, SCADA and EMS interfaces, grid-forming or anti-islanding requirements, and applicable grid-code test conditions. Fixed-speed versus variable-speed operation is a site-specific trade-off; rated power alone does not establish energy yield or permitting suitability.

Record the measurement height, turbulence intensity, availability assumptions, curtailment instructions, and acceptance-test method alongside the energy-yield model. For a wind-plus-storage scope, record battery energy storage system (BESS) boundaries, PCS control mode, state of charge, C-rate and Ingress protection requirements. Reviewers can then distinguish measured inputs from estimates and trace any later change in site conditions, controls, or grid constraints.